Roads & HighwaysIPM · Central Project#617889

Treatment of landslide zone from location no. 01 to 28 km 62.860 to 152.750 on NH-12509 in the State of Uttarakhand under EPC mode in NHO Annual Plan 2022-23

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹192 CrUtilization: 72.5%

Original Cost

₹192 Cr

Baseline estimate

On budget

Revised Cost

₹192 Cr

Latest approved cost

Expenditure

₹139 Cr

Spent to date

Utilization

72.5%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹53 Cr

Budget left

Budget Utilization

72.5%
0%25%50%75%100%

Spent

₹139 Cr

Remaining

₹53 Cr

Total

₹192 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/06/2024

Revised Completion

30/09/2026

Completed

Project Details

Project Code617889
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹192 Cr
Revised Cost₹192 Cr
Expenditure₹139 Cr
Original End Date20/06/2024
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹192 Cr — no cost escalation recorded.

Expenditure stands at ₹139 Cr, which is 72.5% of the revised project cost.

Remaining budget: ₹53 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Treatment of landslide zone from location no. 01 to 28 km 62.860 to 152.750 on NH-12509 in the State of Uttarakhand under EPC mode in NHO Annual Plan 2022-23 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹192.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Treatment of landslide zone from location no. 01 to 28 km 62.860 to 152.750 on N"?
Treatment of landslide zone from location no. 01 to 28 km 62.860 to 152.750 on NH-12509 in the State of Uttarakhand under EPC mode in NHO Annual Plan 2022-23 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹192 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹192 Cr has not been significantly revised. Expenditure: ₹139 Cr (72.5% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Treatment of landslide zone from location no. 01 to 28 km 62 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617889. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Treatment of landslide zone from location no. 01 to 28 km 62 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.