Taranga Hill-Abu Road via Ambaji 116.65 km
Original Cost
₹2798 Cr
Baseline estimate
Revised Cost
₹3300 Cr
Latest approved cost
Expenditure
₹2062 Cr
Spent to date
Utilization
62.5%
Of revised budget
Cost Status
+18.0%
+₹502 Cr increase
Remaining
₹1239 Cr
Budget left
Budget Utilization
62.5%Spent
₹2062 Cr
Remaining
₹1239 Cr
Total
₹3300 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹2798 Cr
Revised Cost
₹3300 Cr
Increase
+₹502 Cr
Escalation
+18.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/07/2030
Revised Completion
31/07/2030
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹502 Cr (18.0%) from the original estimate of ₹2798 Cr.
Expenditure stands at ₹2062 Cr, which is 62.5% of the revised project cost.
Remaining budget: ₹1239 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Taranga Hill-Abu Road via Ambaji 116.65 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2798.00 Cr, later revised to ₹3300.31 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Taranga Hill-Abu Road via Ambaji 116.65 km"?
- Taranga Hill-Abu Road via Ambaji 116.65 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Rajasthan. Original cost: ₹2798 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2798 Cr and has been revised to ₹3300 Cr — a cost overrun of +18%. Expenditure to date: ₹2062 Cr (62.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Taranga Hill-Abu Road via Ambaji 116.65 km is under the Ministry of Railways in the Railways sector. Project code: 400022. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Taranga Hill-Abu Road via Ambaji 116.65 km is one of several Bihar projects tracked under the Railways sector on the IPM system.