Roads & HighwaysIPM · Central Project#618061

Strengthening, Widening & Up-gradation of newly declared NH-761 from NH-61Junction-BelheAlkutiDevibhoyareNighojShirur, from Design chainage Km 0.000 to Km 37.970 from Single/Intermediate/2L to 2LPS in the State of Maharashtra on EPC Mode Length 37.970 Km

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹386 CrUtilization: 29.7%

Original Cost

₹386 Cr

Baseline estimate

On budget

Revised Cost

₹386 Cr

Latest approved cost

Expenditure

₹115 Cr

Spent to date

Utilization

29.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹271 Cr

Budget left

Budget Utilization

29.7%
0%25%50%75%100%

Spent

₹115 Cr

Remaining

₹271 Cr

Total

₹386 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

27/09/2026

Revised Completion

27/09/2026

Completed

Project Details

Project Code618061
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹386 Cr
Revised Cost₹386 Cr
Expenditure₹115 Cr
Original End Date27/09/2026
Revised Date27/09/2026

Project Intelligence

Project is within original budget of ₹386 Cr — no cost escalation recorded.

Expenditure stands at ₹115 Cr, which is 29.7% of the revised project cost.

Remaining budget: ₹271 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Strengthening, Widening & Up-gradation of newly declared NH-761 from NH-61Junction-BelheAlkutiDevibhoyareNighojShirur, from Design chainage Km 0.000 to Km 37.970 from Single/Intermediate/2L to 2LPS in the State of Maharashtra on EPC Mode Length 37.970 Km is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹386.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Strengthening, Widening & Up-gradation of newly declared NH-761 from NH-61Juncti"?
Strengthening, Widening & Up-gradation of newly declared NH-761 from NH-61Junction-BelheAlkutiDevibhoyareNighojShirur, from Design chainage Km 0.000 to Km 37.970 from Single/Intermediate/2L to 2LPS in the State of Maharashtra on EPC Mode Length 37.970 Km is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹386 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹386 Cr has not been significantly revised. Expenditure: ₹115 Cr (29.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Strengthening, Widening & Up-gradation of newly declared NH- is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618061. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Strengthening, Widening & Up-gradation of newly declared NH- is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.