Strengthening of existing 4L Ayodhya Bypass Section from design Km. 121 600 to Km. 144020 of NH 28 New NH 27Pkg-3
Original Cost
₹526 Cr
Baseline estimate
Revised Cost
₹281 Cr
Latest approved cost
Expenditure
₹260 Cr
Spent to date
Utilization
92.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹21 Cr
Budget left
Budget Utilization
92.4%Spent
₹260 Cr
Remaining
₹21 Cr
Total
₹281 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/03/2025
Revised Completion
27/08/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹526 Cr — no cost escalation recorded.
Expenditure stands at ₹260 Cr, which is 92.4% of the revised project cost.
Remaining budget: ₹21 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Strengthening of existing 4L Ayodhya Bypass Section from design Km. 121 600 to Km. 144020 of NH 28 New NH 27Pkg-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹526.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Strengthening of existing 4L Ayodhya Bypass Section from design Km. 121 600 to K"?
- Strengthening of existing 4L Ayodhya Bypass Section from design Km. 121 600 to Km. 144020 of NH 28 New NH 27Pkg-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹526 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹526 Cr and has been revised to ₹281 Cr — a cost overrun of -46.6%. Expenditure to date: ₹260 Cr (92.4% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Strengthening of existing 4L Ayodhya Bypass Section from des is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618565. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Strengthening of existing 4L Ayodhya Bypass Section from des is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.