Roads & HighwaysIPM · Central Project#618133

Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadchiroli-Ashti- Allapalli -Sironcha National highway NH 353C in Km 262/00 to 321/00 including 16 minor Bridges and 2 Major Bridge Total length 59 Km section from repanpalli to sironcha in Gadchiroli Dist in the State of Maharashtra.

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹281 CrUtilization: 75.1%

Original Cost

₹281 Cr

Baseline estimate

On budget

Revised Cost

₹281 Cr

Latest approved cost

Expenditure

₹211 Cr

Spent to date

Utilization

75.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹70 Cr

Budget left

Budget Utilization

75.1%
0%25%50%75%100%

Spent

₹211 Cr

Remaining

₹70 Cr

Total

₹281 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/05/2024

Revised Completion

31/03/2027

Completed

Project Details

Project Code618133
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹281 Cr
Revised Cost₹281 Cr
Expenditure₹211 Cr
Original End Date31/05/2024
Revised Date31/03/2027

Project Intelligence

Project is within original budget of ₹281 Cr — no cost escalation recorded.

Expenditure stands at ₹211 Cr, which is 75.1% of the revised project cost.

Remaining budget: ₹70 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadchiroli-Ashti- Allapalli -Sironcha National highway NH 353C in Km 262/00 to 321/00 including 16 minor Bridges and 2 Major Bridge Total length 59 Km section from repanpalli to sironcha in Gadchiroli Dist in the State of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹281.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadchiroli-Ashti- Allapa"?
Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadchiroli-Ashti- Allapalli -Sironcha National highway NH 353C in Km 262/00 to 321/00 including 16 minor Bridges and 2 Major Bridge Total length 59 Km section from repanpalli to sironcha in Gadchiroli Dist in the State of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹281 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹281 Cr has not been significantly revised. Expenditure: ₹211 Cr (75.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadc is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618133. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Strengthening and Widening of road Sakoli- Wadsa-Armori-Gadc is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.