South Central Railway - Rail road over double line between Guntakal West-Mallapa Gate 9.64 km PB34/CR/2023-24
Original Cost
₹293 Cr
Baseline estimate
Revised Cost
₹293 Cr
Latest approved cost
Expenditure
₹95 Cr
Spent to date
Utilization
32.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹198 Cr
Budget left
Budget Utilization
32.3%Spent
₹95 Cr
Remaining
₹198 Cr
Total
₹293 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/07/2026
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹293 Cr — no cost escalation recorded.
Expenditure stands at ₹95 Cr, which is 32.3% of the revised project cost.
Remaining budget: ₹198 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
South Central Railway - Rail road over double line between Guntakal West-Mallapa Gate 9.64 km PB34/CR/2023-24 is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹293.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "South Central Railway - Rail road over double line between Guntakal West-Mallapa"?
- South Central Railway - Rail road over double line between Guntakal West-Mallapa Gate 9.64 km PB34/CR/2023-24 is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Andhra Pradesh. Original cost: ₹293 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹293 Cr has not been significantly revised. Expenditure: ₹95 Cr (32.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- South Central Railway - Rail road over double line between G is under the Ministry of Railways in the Railways sector. Project code: 611754. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. South Central Railway - Rail road over double line between G is one of several Bihar projects tracked under the Railways sector on the IPM system.