Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 and Nepali Farm-Motichur NH-34 on EPC Mode in Uttarakhand under NHO.
Original Cost
₹721 Cr
Baseline estimate
Revised Cost
₹388 Cr
Latest approved cost
Expenditure
₹19 Cr
Spent to date
Utilization
4.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹369 Cr
Budget left
Budget Utilization
4.9%Spent
₹19 Cr
Remaining
₹369 Cr
Total
₹388 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/08/2028
Revised Completion
14/08/2028
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹721 Cr — no cost escalation recorded.
Expenditure stands at ₹19 Cr, which is 4.9% of the revised project cost.
Remaining budget: ₹369 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 and Nepali Farm-Motichur NH-34 on EPC Mode in Uttarakhand under NHO. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹721.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nep"?
- Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH-7 and Nepali Farm-Motichur NH-34 on EPC Mode in Uttarakhand under NHO. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹721 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹721 Cr and has been revised to ₹388 Cr — a cost overrun of -46.2%. Expenditure to date: ₹19 Cr (4.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Road Safety Improvement of existing four lane section of Deh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619294. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Road Safety Improvement of existing four lane section of Deh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.