Roads & HighwaysIPM · Central Project#617959

Rehabilitation & Widening work for 2 Lane with Paved Shoulder of Existing NH-80 from km 70.15 to Km 121.025 of Munger-Suttanganj -BhagatpurMirzachowki section on EPC Mode in the State of Bihar.

Ministry of Road Transport & HighwaysBihar
Revised Cost: ₹478 CrUtilization: 65.1%

Original Cost

₹478 Cr

Baseline estimate

On budget

Revised Cost

₹478 Cr

Latest approved cost

Expenditure

₹311 Cr

Spent to date

Utilization

65.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹167 Cr

Budget left

Budget Utilization

65.1%
0%25%50%75%100%

Spent

₹311 Cr

Remaining

₹167 Cr

Total

₹478 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/01/2025

Revised Completion

Completed

Project Details

Project Code617959
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateBihar
Data Month2026-05

Financial Summary

Original Cost₹478 Cr
Revised Cost₹478 Cr
Expenditure₹311 Cr
Original End Date31/01/2025
Revised DateN/A

Project Intelligence

Project is within original budget of ₹478 Cr — no cost escalation recorded.

Expenditure stands at ₹311 Cr, which is 65.1% of the revised project cost.

Remaining budget: ₹167 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation & Widening work for 2 Lane with Paved Shoulder of Existing NH-80 from km 70.15 to Km 121.025 of Munger-Suttanganj -BhagatpurMirzachowki section on EPC Mode in the State of Bihar. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹478.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation & Widening work for 2 Lane with Paved Shoulder of Existing NH-80 "?
Rehabilitation & Widening work for 2 Lane with Paved Shoulder of Existing NH-80 from km 70.15 to Km 121.025 of Munger-Suttanganj -BhagatpurMirzachowki section on EPC Mode in the State of Bihar. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹478 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹478 Cr has not been significantly revised. Expenditure: ₹311 Cr (65.1% of cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Rehabilitation & Widening work for 2 Lane with Paved Shoulde is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617959. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation & Widening work for 2 Lane with Paved Shoulde is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.