Roads & HighwaysIPM · Central Project +8.6% overrun#618386

Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 Total length-18.600 km of Kumarghat-Kailashahar section on NH-208 to 2-lane with Paved shoulder on EPC bais under NHO

Ministry of Road Transport & HighwaysTripura
Revised Cost: ₹302 CrUtilization: 0.0%Overrun: +₹24 Cr

Original Cost

₹278 Cr

Baseline estimate

+9% overrun

Revised Cost

₹302 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Escalated

Cost Status

+8.6%

+₹24 Cr increase

Remaining

₹302 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹302 Cr

Total

₹302 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹278 Cr

Revised Cost

₹302 Cr

Increase

+₹24 Cr

Escalation

+8.6%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

13/01/2022

Revised Completion

15/10/2024

Completed

Project Details

Project Code618386
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTripura
Data Month2026-05

Financial Summary

Original Cost₹278 Cr
Revised Cost₹302 Cr
Expenditure₹0 Cr
Original End Date13/01/2022
Revised Date15/10/2024

Project Intelligence

Cost has increased by ₹24 Cr (8.6%) from the original estimate of ₹278 Cr.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹302 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 Total length-18.600 km of Kumarghat-Kailashahar section on NH-208 to 2-lane with Paved shoulder on EPC bais under NHO is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹278.00 Cr, later revised to ₹302.03 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 Total length-18.6"?
Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.600 Total length-18.600 km of Kumarghat-Kailashahar section on NH-208 to 2-lane with Paved shoulder on EPC bais under NHO is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Tripura. Original cost: ₹278 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹278 Cr and has been revised to ₹302 Cr — a cost overrun of +8.6%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.6 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618386. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation & Upgradation of Road from Km 0.00 to Km 18.6 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.