Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road section of NH-346, from Design Chainge 0.000 to 81.300 Km Total length 83.1 km to Two lane with paved shoulder configuration along with One time improvement in 07 nos of bypassed built-up areas in a total length of 22.615 km in the state of Madhya Pradesh on EPC mode.
Original Cost
₹386 Cr
Baseline estimate
Revised Cost
₹386 Cr
Latest approved cost
Expenditure
₹243 Cr
Spent to date
Utilization
62.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹143 Cr
Budget left
Budget Utilization
62.9%Spent
₹243 Cr
Remaining
₹143 Cr
Total
₹386 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/02/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹386 Cr — no cost escalation recorded.
Expenditure stands at ₹243 Cr, which is 62.9% of the revised project cost.
Remaining budget: ₹143 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road section of NH-346, from Design Chainge 0.000 to 81.300 Km Total length 83.1 km to Two lane with paved shoulder configuration along with One time improvement in 07 nos of bypassed built-up areas in a total length of 22.615 km in the state of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹386.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road section of NH-346, f"?
- Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road section of NH-346, from Design Chainge 0.000 to 81.300 Km Total length 83.1 km to Two lane with paved shoulder configuration along with One time improvement in 07 nos of bypassed built-up areas in a total length of 22.615 km in the state of Madhya Pradesh on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹386 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹386 Cr has not been significantly revised. Expenditure: ₹243 Cr (62.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618020. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation & Upgradation of KurwaiMungaoliChanderi Road is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.