Roads & HighwaysIPM · Central Project#618134

Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra.

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹459 CrUtilization: 48.1%

Original Cost

₹459 Cr

Baseline estimate

On budget

Revised Cost

₹459 Cr

Latest approved cost

Expenditure

₹221 Cr

Spent to date

Utilization

48.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹238 Cr

Budget left

Budget Utilization

48.1%
0%25%50%75%100%

Spent

₹221 Cr

Remaining

₹238 Cr

Total

₹459 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

08/09/2026

Revised Completion

08/09/2026

Completed

Project Details

Project Code618134
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹459 Cr
Revised Cost₹459 Cr
Expenditure₹221 Cr
Original End Date08/09/2026
Revised Date08/09/2026

Project Intelligence

Project is within original budget of ₹459 Cr — no cost escalation recorded.

Expenditure stands at ₹221 Cr, which is 48.1% of the revised project cost.

Remaining budget: ₹238 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹459.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to"?
Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹459 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹459 Cr has not been significantly revised. Expenditure: ₹221 Cr (48.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation /Upgradation from Lagam to Alapalli section D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618134. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation /Upgradation from Lagam to Alapalli section D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.