Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra.
Original Cost
₹459 Cr
Baseline estimate
Revised Cost
₹459 Cr
Latest approved cost
Expenditure
₹221 Cr
Spent to date
Utilization
48.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹238 Cr
Budget left
Budget Utilization
48.1%Spent
₹221 Cr
Remaining
₹238 Cr
Total
₹459 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
08/09/2026
Revised Completion
08/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹459 Cr — no cost escalation recorded.
Expenditure stands at ₹221 Cr, which is 48.1% of the revised project cost.
Remaining budget: ₹238 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹459.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to"?
- Rehabilitation /Upgradation from Lagam to Alapalli section Desing Km. 199/400 to km 227/400 Length 28.0 Km to 2 lane with Paved Shoulders/ 4 lane configuration section of NH-353 C Sakoli-Wadsa-Armori-Gadchiroli-Ashti-Alapalli Sironcha in Gadchiroli District on EPC mode in the state of Maharashtra. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹459 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹459 Cr has not been significantly revised. Expenditure: ₹221 Cr (48.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation /Upgradation from Lagam to Alapalli section D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618134. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation /Upgradation from Lagam to Alapalli section D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.