Roads & HighwaysIPM · Central Project +23.1% overrun#617966

Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of of Birpur and Bihpur Section from km 0.0 to Km 106 of NH 106 under phase I of National Highways Interconnectivity Improvement Projects NHIIP ICB No. NHIIP-BR-106-7 [NHIIP-BR-106-7]

Ministry of Road Transport & HighwaysBihar
Revised Cost: ₹961 CrUtilization: 86.6%Overrun: +₹180 Cr

Original Cost

₹781 Cr

Baseline estimate

+23% overrun

Revised Cost

₹961 Cr

Latest approved cost

Expenditure

₹832 Cr

Spent to date

Utilization

86.6%

Of revised budget

Escalated

Cost Status

+23.1%

+₹180 Cr increase

Remaining

₹129 Cr

Budget left

Budget Utilization

86.6%
0%25%50%75%100%

Spent

₹832 Cr

Remaining

₹129 Cr

Total

₹961 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹781 Cr

Revised Cost

₹961 Cr

Increase

+₹180 Cr

Escalation

+23.1%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/10/2019

Revised Completion

31/10/2026

Completed

Project Details

Project Code617966
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateBihar
Data Month2026-08

Financial Summary

Original Cost₹781 Cr
Revised Cost₹961 Cr
Expenditure₹832 Cr
Original End Date02/10/2019
Revised Date31/10/2026

Project Intelligence

Cost has increased by ₹180 Cr (23.1%) from the original estimate of ₹781 Cr.

Expenditure stands at ₹832 Cr, which is 86.6% of the revised project cost.

Remaining budget: ₹129 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of of Birpur and Bihpur Section from km 0.0 to Km 106 of NH 106 under phase I of National Highways Interconnectivity Improvement Projects NHIIP ICB No. NHIIP-BR-106-7 [NHIIP-BR-106-7] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹781.00 Cr, later revised to ₹961.33 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuratio"?
Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of of Birpur and Bihpur Section from km 0.0 to Km 106 of NH 106 under phase I of National Highways Interconnectivity Improvement Projects NHIIP ICB No. NHIIP-BR-106-7 [NHIIP-BR-106-7] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹781 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹781 Cr and has been revised to ₹961 Cr — a cost overrun of +23.1%. Expenditure to date: ₹832 Cr (86.6% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and Upgrading to 2 lanes/2-lane with paved sh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617966. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Upgrading to 2 lanes/2-lane with paved sh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.