Original Cost
₹781 Cr
Baseline estimate
Revised Cost
₹961 Cr
Latest approved cost
Expenditure
₹832 Cr
Spent to date
Utilization
86.6%
Of revised budget
Cost Status
+23.1%
+₹180 Cr increase
Remaining
₹129 Cr
Budget left
Budget Utilization
86.6%Spent
₹832 Cr
Remaining
₹129 Cr
Total
₹961 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹781 Cr
Revised Cost
₹961 Cr
Increase
+₹180 Cr
Escalation
+23.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
02/10/2019
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹180 Cr (23.1%) from the original estimate of ₹781 Cr.
Expenditure stands at ₹832 Cr, which is 86.6% of the revised project cost.
Remaining budget: ₹129 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of of Birpur and Bihpur Section from km 0.0 to Km 106 of NH 106 under phase I of National Highways Interconnectivity Improvement Projects NHIIP ICB No. NHIIP-BR-106-7 [NHIIP-BR-106-7] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹781.00 Cr, later revised to ₹961.33 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuratio"?
- Rehabilitation and Upgrading to 2 lanes/2-lane with paved shoulders configuration and strengthening of of Birpur and Bihpur Section from km 0.0 to Km 106 of NH 106 under phase I of National Highways Interconnectivity Improvement Projects NHIIP ICB No. NHIIP-BR-106-7 [NHIIP-BR-106-7] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Bihar. Original cost: ₹781 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹781 Cr and has been revised to ₹961 Cr — a cost overrun of +23.1%. Expenditure to date: ₹832 Cr (86.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Upgrading to 2 lanes/2-lane with paved sh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617966. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Upgrading to 2 lanes/2-lane with paved sh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.