Rehabilitation and upgradation Umaria to Shahdol section of NH-78 from Existing Km. 68/4 to Km. 142/2 to 2LPS including construction of Birshinghpur and Shahdol Bypass on EPC mode under NHDP-IVA
Original Cost
₹512 Cr
Baseline estimate
Revised Cost
₹613 Cr
Latest approved cost
Expenditure
₹505 Cr
Spent to date
Utilization
82.3%
Of revised budget
Cost Status
+19.8%
+₹101 Cr increase
Remaining
₹108 Cr
Budget left
Budget Utilization
82.3%Spent
₹505 Cr
Remaining
₹108 Cr
Total
₹613 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹512 Cr
Revised Cost
₹613 Cr
Increase
+₹101 Cr
Escalation
+19.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/07/2017
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹101 Cr (19.8%) from the original estimate of ₹512 Cr.
Expenditure stands at ₹505 Cr, which is 82.3% of the revised project cost.
Remaining budget: ₹108 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation Umaria to Shahdol section of NH-78 from Existing Km. 68/4 to Km. 142/2 to 2LPS including construction of Birshinghpur and Shahdol Bypass on EPC mode under NHDP-IVA is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹512.00 Cr, later revised to ₹613.16 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation Umaria to Shahdol section of NH-78 from Existing "?
- Rehabilitation and upgradation Umaria to Shahdol section of NH-78 from Existing Km. 68/4 to Km. 142/2 to 2LPS including construction of Birshinghpur and Shahdol Bypass on EPC mode under NHDP-IVA is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Madhya Pradesh. Original cost: ₹512 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹512 Cr and has been revised to ₹613 Cr — a cost overrun of +19.8%. Expenditure to date: ₹505 Cr (82.3% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation Umaria to Shahdol section of is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617911. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation Umaria to Shahdol section of is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.