Rehabilitation and upgradation to 2 lane with paved shoulder configuration from km 122.00 Dharasu Bend to km 147.230 Silkyara Bend of NH-94 in the state of Uttarakhand
Original Cost
₹238 Cr
Baseline estimate
Revised Cost
₹238 Cr
Latest approved cost
Expenditure
₹80 Cr
Spent to date
Utilization
33.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹158 Cr
Budget left
Budget Utilization
33.4%Spent
₹80 Cr
Remaining
₹158 Cr
Total
₹238 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/11/2019
Revised Completion
31/07/2024
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹238 Cr — no cost escalation recorded.
Expenditure stands at ₹80 Cr, which is 33.4% of the revised project cost.
Remaining budget: ₹158 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation to 2 lane with paved shoulder configuration from km 122.00 Dharasu Bend to km 147.230 Silkyara Bend of NH-94 in the state of Uttarakhand is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹238.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation to 2 lane with paved shoulder configuration from "?
- Rehabilitation and upgradation to 2 lane with paved shoulder configuration from km 122.00 Dharasu Bend to km 147.230 Silkyara Bend of NH-94 in the state of Uttarakhand is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹238 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹238 Cr has not been significantly revised. Expenditure: ₹80 Cr (33.4% of cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation to 2 lane with paved shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617975. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2 lane with paved shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.