Roads & HighwaysIPM · Central Project#618256

Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹311 CrUtilization: 69.9%

Original Cost

₹311 Cr

Baseline estimate

On budget

Revised Cost

₹311 Cr

Latest approved cost

Expenditure

₹217 Cr

Spent to date

Utilization

69.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹94 Cr

Budget left

Budget Utilization

69.9%
0%25%50%75%100%

Spent

₹217 Cr

Remaining

₹94 Cr

Total

₹311 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

10/10/2024

Revised Completion

30/09/2026

Completed

Project Details

Project Code618256
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹311 Cr
Revised Cost₹311 Cr
Expenditure₹217 Cr
Original End Date10/10/2024
Revised Date30/09/2026

Project Intelligence

Project is within original budget of ₹311 Cr — no cost escalation recorded.

Expenditure stands at ₹217 Cr, which is 69.9% of the revised project cost.

Remaining budget: ₹94 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹311.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configurati"?
Rehabilitation and Upgradation to 2-lane with paved should ders Sir, configuration of Chaprathipalem to Lambasingi section Km 165500 to Km 205000 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP with the loan assistance of World Bank on EPC mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹311 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹311 Cr has not been significantly revised. Expenditure: ₹217 Cr (69.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and Upgradation to 2-lane with paved should d is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618256. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Upgradation to 2-lane with paved should d is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.