Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode.
Original Cost
₹211 Cr
Baseline estimate
Revised Cost
₹207 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹207 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹207 Cr
Total
₹207 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
17/02/2024
Revised Completion
09/02/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹211 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹207 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹211.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation to 2-lane with paved sholuders configuration of N"?
- Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹211 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹211 Cr and has been revised to ₹207 Cr — a cost overrun of -2.1%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation to 2-lane with paved sholuder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618229. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2-lane with paved sholuder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.