Roads & HighwaysIPM · Central Project#618229

Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode.

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹207 CrUtilization: 0.0%

Original Cost

₹211 Cr

Baseline estimate

On budget

Revised Cost

₹207 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹207 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹207 Cr

Total

₹207 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/02/2024

Revised Completion

09/02/2025

Completed

Project Details

Project Code618229
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-05

Financial Summary

Original Cost₹211 Cr
Revised Cost₹207 Cr
Expenditure₹0 Cr
Original End Date17/02/2024
Revised Date09/02/2025

Project Intelligence

Project is within original budget of ₹211 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹207 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹211.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and upgradation to 2-lane with paved sholuders configuration of N"?
Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Near Karri village-Etawah section Km30.000 to Km 57.346 Pakage-II of NH-92 in state of Uttar Pradesh undergreen national Highway Corridor ProjectGNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹211 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹211 Cr and has been revised to ₹207 Cr — a cost overrun of -2.1%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2026-05.
QWhich ministry is responsible for this project?
Rehabilitation and upgradation to 2-lane with paved sholuder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618229. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2-lane with paved sholuder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.