Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Bewar- Allahaganj- section of NH-730C Km.0.000 to Km 52.770 pakage-I in state of Uttar Pradesh undergreen national Highway Corridor Project GNHCP with the loan assistance of world Bank on EPC mode.
Original Cost
₹325 Cr
Baseline estimate
Revised Cost
₹340 Cr
Latest approved cost
Expenditure
₹307 Cr
Spent to date
Utilization
90.1%
Of revised budget
Cost Status
+4.7%
+₹15 Cr increase
Remaining
₹34 Cr
Budget left
Budget Utilization
90.1%Spent
₹307 Cr
Remaining
₹34 Cr
Total
₹340 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹325 Cr
Revised Cost
₹340 Cr
Increase
+₹15 Cr
Escalation
+4.7%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
23/11/2024
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹15 Cr (4.7%) from the original estimate of ₹325 Cr.
Expenditure stands at ₹307 Cr, which is 90.1% of the revised project cost.
Remaining budget: ₹34 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Bewar- Allahaganj- section of NH-730C Km.0.000 to Km 52.770 pakage-I in state of Uttar Pradesh undergreen national Highway Corridor Project GNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹325.00 Cr, later revised to ₹340.16 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation to 2-lane with paved sholuders configuration of B"?
- Rehabilitation and upgradation to 2-lane with paved sholuders configuration of Bewar- Allahaganj- section of NH-730C Km.0.000 to Km 52.770 pakage-I in state of Uttar Pradesh undergreen national Highway Corridor Project GNHCP with the loan assistance of world Bank on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹325 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹325 Cr and has been revised to ₹340 Cr — a cost overrun of +4.7%. Expenditure to date: ₹307 Cr (90.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation to 2-lane with paved sholuder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618266. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2-lane with paved sholuder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.