Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand.
Original Cost
₹346 Cr
Baseline estimate
Revised Cost
₹346 Cr
Latest approved cost
Expenditure
₹297 Cr
Spent to date
Utilization
85.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹49 Cr
Budget left
Budget Utilization
85.7%Spent
₹297 Cr
Remaining
₹49 Cr
Total
₹346 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/07/2021
Revised Completion
01/06/2024
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹346 Cr — no cost escalation recorded.
Expenditure stands at ₹297 Cr, which is 85.7% of the revised project cost.
Remaining budget: ₹49 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹346.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configurat"?
- Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹346 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹346 Cr has not been significantly revised. Expenditure: ₹297 Cr (85.7% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation to 2 lane / 2 lane with paved is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618214. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2 lane / 2 lane with paved is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.