Roads & HighwaysIPM · Central Project#618214

Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand.

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹346 CrUtilization: 85.7%

Original Cost

₹346 Cr

Baseline estimate

On budget

Revised Cost

₹346 Cr

Latest approved cost

Expenditure

₹297 Cr

Spent to date

Utilization

85.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹49 Cr

Budget left

Budget Utilization

85.7%
0%25%50%75%100%

Spent

₹297 Cr

Remaining

₹49 Cr

Total

₹346 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

09/07/2021

Revised Completion

01/06/2024

Completed

Project Details

Project Code618214
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹346 Cr
Revised Cost₹346 Cr
Expenditure₹297 Cr
Original End Date09/07/2021
Revised Date01/06/2024

Project Intelligence

Project is within original budget of ₹346 Cr — no cost escalation recorded.

Expenditure stands at ₹297 Cr, which is 85.7% of the revised project cost.

Remaining budget: ₹49 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹346.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configurat"?
Rehabilitation and upgradation to 2 lane / 2 lane with paved shoulder configuration for design chainage km 107.347 to km 129.208 & km 133.878 to km 138.570 existing chainage km 110.000 to km 133.020 & km 137.330 to km 142.028 and land slide treatment at existing km 138.500 Design chainage km 134.970 of NH -94 on EPC mode under improvement to NH connectivity to Chardham in the state of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹346 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹346 Cr has not been significantly revised. Expenditure: ₹297 Cr (85.7% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and upgradation to 2 lane / 2 lane with paved is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618214. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation to 2 lane / 2 lane with paved is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.