Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 excluding km 2/255 to 3/372 and km 36/820 to 38/275 Odisha border to Narasamapeta to two lane with paved Shoulders in the State of Andhra Pradesh under NHO on EPC Mode
Original Cost
₹228 Cr
Baseline estimate
Revised Cost
₹228 Cr
Latest approved cost
Expenditure
₹183 Cr
Spent to date
Utilization
80.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹45 Cr
Budget left
Budget Utilization
80.3%Spent
₹183 Cr
Remaining
₹45 Cr
Total
₹228 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/03/2020
Revised Completion
07/10/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹228 Cr — no cost escalation recorded.
Expenditure stands at ₹183 Cr, which is 80.3% of the revised project cost.
Remaining budget: ₹45 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 excluding km 2/255 to 3/372 and km 36/820 to 38/275 Odisha border to Narasamapeta to two lane with paved Shoulders in the State of Andhra Pradesh under NHO on EPC Mode is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹228.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 excluding km 2/2"?
- Rehabilitation and upgradation of NH 326A from km 0/0 to 41/979 excluding km 2/255 to 3/372 and km 36/820 to 38/275 Odisha border to Narasamapeta to two lane with paved Shoulders in the State of Andhra Pradesh under NHO on EPC Mode is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹228 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹228 Cr has not been significantly revised. Expenditure: ₹183 Cr (80.3% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation of NH 326A from km 0/0 to 41/ is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618125. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation of NH 326A from km 0/0 to 41/ is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.