Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Mallepally Haliya section to two lane with paved shoulders on EPC mode in the stte of Telangana
Original Cost
₹294 Cr
Baseline estimate
Revised Cost
₹258 Cr
Latest approved cost
Expenditure
₹249 Cr
Spent to date
Utilization
96.7%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹8 Cr
Budget left
Budget Utilization
96.7%Spent
₹249 Cr
Remaining
₹8 Cr
Total
₹258 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/11/2019
Revised Completion
06/12/2025
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹294 Cr — no cost escalation recorded.
Expenditure stands at ₹249 Cr, which is 96.7% of the revised project cost.
Remaining budget: ₹8 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Mallepally Haliya section to two lane with paved shoulders on EPC mode in the stte of Telangana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹294.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Malle"?
- Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Mallepally Haliya section to two lane with paved shoulders on EPC mode in the stte of Telangana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹294 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹294 Cr and has been revised to ₹258 Cr — a cost overrun of -12.4%. Expenditure to date: ₹249 Cr (96.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and upgradation of NH-167 from design km 113. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617994. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation of NH-167 from design km 113. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.