Revised Cost: ₹258 CrUtilization: 96.7%

Original Cost

₹294 Cr

Baseline estimate

On budget

Revised Cost

₹258 Cr

Latest approved cost

Expenditure

₹249 Cr

Spent to date

Utilization

96.7%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹8 Cr

Budget left

Budget Utilization

96.7%
0%25%50%75%100%

Spent

₹249 Cr

Remaining

₹8 Cr

Total

₹258 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

28/11/2019

Revised Completion

06/12/2025

Completed

Project Details

Project Code617994
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateTelangana
Data Month2026-08

Financial Summary

Original Cost₹294 Cr
Revised Cost₹258 Cr
Expenditure₹249 Cr
Original End Date28/11/2019
Revised Date06/12/2025

Project Intelligence

Project is within original budget of ₹294 Cr — no cost escalation recorded.

Expenditure stands at ₹249 Cr, which is 96.7% of the revised project cost.

Remaining budget: ₹8 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Mallepally Haliya section to two lane with paved shoulders on EPC mode in the stte of Telangana is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹294.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Malle"?
Rehabilitation and upgradation of NH-167 from design km 113.900 to 154.479 Mallepally Haliya section to two lane with paved shoulders on EPC mode in the stte of Telangana is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹294 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹294 Cr and has been revised to ₹258 Cr — a cost overrun of -12.4%. Expenditure to date: ₹249 Cr (96.7% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and upgradation of NH-167 from design km 113. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617994. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation of NH-167 from design km 113. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.