Roads & HighwaysIPM · Central Project#617974

Rehabilitation and upgradation of 2 lane with paved shoulder from existing km. 195.175 to km. 220.000 Design Chainage km71.300 to Km. 95.947 Excluding existing chainage Km 200.300 to Km 202.400 Design chainage Km 76.400 to Km 78.400 on Dharasu to Yamunotri Road of NH- 134 Old NH-94

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹345 CrUtilization: 12.4%

Original Cost

₹345 Cr

Baseline estimate

On budget

Revised Cost

₹345 Cr

Latest approved cost

Expenditure

₹43 Cr

Spent to date

Utilization

12.4%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹302 Cr

Budget left

Budget Utilization

12.4%
0%25%50%75%100%

Spent

₹43 Cr

Remaining

₹302 Cr

Total

₹345 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

02/04/2028

Revised Completion

Completed

Project Details

Project Code617974
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹345 Cr
Revised Cost₹345 Cr
Expenditure₹43 Cr
Original End Date02/04/2028
Revised DateN/A

Project Intelligence

Project is within original budget of ₹345 Cr — no cost escalation recorded.

Expenditure stands at ₹43 Cr, which is 12.4% of the revised project cost.

Remaining budget: ₹302 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and upgradation of 2 lane with paved shoulder from existing km. 195.175 to km. 220.000 Design Chainage km71.300 to Km. 95.947 Excluding existing chainage Km 200.300 to Km 202.400 Design chainage Km 76.400 to Km 78.400 on Dharasu to Yamunotri Road of NH- 134 Old NH-94 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹345.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and upgradation of 2 lane with paved shoulder from existing km. 1"?
Rehabilitation and upgradation of 2 lane with paved shoulder from existing km. 195.175 to km. 220.000 Design Chainage km71.300 to Km. 95.947 Excluding existing chainage Km 200.300 to Km 202.400 Design chainage Km 76.400 to Km 78.400 on Dharasu to Yamunotri Road of NH- 134 Old NH-94 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹345 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹345 Cr has not been significantly revised. Expenditure: ₹43 Cr (12.4% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and upgradation of 2 lane with paved shoulder is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617974. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and upgradation of 2 lane with paved shoulder is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.