Roads & HighwaysIPM · Central Project#618263

Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh

Ministry of Road Transport & HighwaysUttar Pradesh
Revised Cost: ₹701 CrUtilization: 62.2%

Original Cost

₹701 Cr

Baseline estimate

On budget

Revised Cost

₹701 Cr

Latest approved cost

Expenditure

₹436 Cr

Spent to date

Utilization

62.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹265 Cr

Budget left

Budget Utilization

62.2%
0%25%50%75%100%

Spent

₹436 Cr

Remaining

₹265 Cr

Total

₹701 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

31/07/2026

Revised Completion

31/10/2026

Completed

Project Details

Project Code618263
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttar Pradesh
Data Month2026-08

Financial Summary

Original Cost₹701 Cr
Revised Cost₹701 Cr
Expenditure₹436 Cr
Original End Date31/07/2026
Revised Date31/10/2026

Project Intelligence

Project is within original budget of ₹701 Cr — no cost escalation recorded.

Expenditure stands at ₹436 Cr, which is 62.2% of the revised project cost.

Remaining budget: ₹265 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹701.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.4"?
Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹701 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹701 Cr has not been significantly revised. Expenditure: ₹436 Cr (62.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618263. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.