Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh
Original Cost
₹701 Cr
Baseline estimate
Revised Cost
₹701 Cr
Latest approved cost
Expenditure
₹436 Cr
Spent to date
Utilization
62.2%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹265 Cr
Budget left
Budget Utilization
62.2%Spent
₹436 Cr
Remaining
₹265 Cr
Total
₹701 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/07/2026
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹701 Cr — no cost escalation recorded.
Expenditure stands at ₹436 Cr, which is 62.2% of the revised project cost.
Remaining budget: ₹265 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹701.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.4"?
- Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km. 7.800 and Km. 35.400 to Km. 52.345 Design length 24.745 Km., except Bihar portion of NH-727B Tamkuhiraj to Bihar Border and Bihar Border to Majhauli on EPC mode in the State of Uttar Pradesh is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttar Pradesh. Original cost: ₹701 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹701 Cr has not been significantly revised. Expenditure: ₹436 Cr (62.2% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618263. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation to 2LPS from Km. 0.000 to Km is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.