Roads & HighwaysIPM · Central Project#618096

Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak-Patan-Karad section Km. 85000 to 133 417 of NH-166E in the state of Maharashtra on EPC mode.

Ministry of Road Transport & HighwaysMaharashtra
Revised Cost: ₹181 CrUtilization: 46.9%

Original Cost

₹181 Cr

Baseline estimate

On budget

Revised Cost

₹181 Cr

Latest approved cost

Expenditure

₹85 Cr

Spent to date

Utilization

46.9%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹96 Cr

Budget left

Budget Utilization

46.9%
0%25%50%75%100%

Spent

₹85 Cr

Remaining

₹96 Cr

Total

₹181 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

14/04/2026

Revised Completion

28/02/2027

Completed

Project Details

Project Code618096
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMaharashtra
Data Month2026-08

Financial Summary

Original Cost₹181 Cr
Revised Cost₹181 Cr
Expenditure₹85 Cr
Original End Date14/04/2026
Revised Date28/02/2027

Project Intelligence

Project is within original budget of ₹181 Cr — no cost escalation recorded.

Expenditure stands at ₹85 Cr, which is 46.9% of the revised project cost.

Remaining budget: ₹96 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak-Patan-Karad section Km. 85000 to 133 417 of NH-166E in the state of Maharashtra on EPC mode. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹181.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuratio"?
Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak-Patan-Karad section Km. 85000 to 133 417 of NH-166E in the state of Maharashtra on EPC mode. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Maharashtra. Original cost: ₹181 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹181 Cr has not been significantly revised. Expenditure: ₹85 Cr (46.9% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Rehabilitation and Up-gradation to 2 lane road with paved sh is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618096. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation to 2 lane road with paved sh is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.