Rehabilitation and Up-gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH-930P in the State of Telangana on Engineering, Procurement and Construction EPC Basis
Original Cost
₹549 Cr
Baseline estimate
Revised Cost
₹549 Cr
Latest approved cost
Expenditure
₹389 Cr
Spent to date
Utilization
70.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹160 Cr
Budget left
Budget Utilization
70.9%Spent
₹389 Cr
Remaining
₹160 Cr
Total
₹549 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
24/09/2025
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹549 Cr — no cost escalation recorded.
Expenditure stands at ₹389 Cr, which is 70.9% of the revised project cost.
Remaining budget: ₹160 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up-gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH-930P in the State of Telangana on Engineering, Procurement and Construction EPC Basis is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹549.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up-gradation of Valigonda to Thorrur Section to Two Lane with"?
- Rehabilitation and Up-gradation of Valigonda to Thorrur Section to Two Lane with Paved Shoulders from Km 39.180 to Km 108.300 of NH-930P in the State of Telangana on Engineering, Procurement and Construction EPC Basis is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹549 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹549 Cr has not been significantly revised. Expenditure: ₹389 Cr (70.9% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up-gradation of Valigonda to Thorrur Sect is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618186. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation of Valigonda to Thorrur Sect is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.