Rehabilitation and Up-gradation of existing road to 2L PS from End of Hamirpur Bypass near Chilbahal to Bhangbar section from Km. 138.295 to Km.175.270 of NH-88 Pkg-IV
Original Cost
₹1146 Cr
Baseline estimate
Revised Cost
₹1359 Cr
Latest approved cost
Expenditure
₹988 Cr
Spent to date
Utilization
72.7%
Of revised budget
Cost Status
+18.6%
+₹213 Cr increase
Remaining
₹371 Cr
Budget left
Budget Utilization
72.7%Spent
₹988 Cr
Remaining
₹371 Cr
Total
₹1359 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1146 Cr
Revised Cost
₹1359 Cr
Increase
+₹213 Cr
Escalation
+18.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
27/04/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹213 Cr (18.6%) from the original estimate of ₹1146 Cr.
Expenditure stands at ₹988 Cr, which is 72.7% of the revised project cost.
Remaining budget: ₹371 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up-gradation of existing road to 2L PS from End of Hamirpur Bypass near Chilbahal to Bhangbar section from Km. 138.295 to Km.175.270 of NH-88 Pkg-IV is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹1146.00 Cr, later revised to ₹1358.62 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up-gradation of existing road to 2L PS from End of Hamirpur B"?
- Rehabilitation and Up-gradation of existing road to 2L PS from End of Hamirpur Bypass near Chilbahal to Bhangbar section from Km. 138.295 to Km.175.270 of NH-88 Pkg-IV is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Himachal Pradesh. Original cost: ₹1146 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1146 Cr and has been revised to ₹1359 Cr — a cost overrun of +18.6%. Expenditure to date: ₹988 Cr (72.7% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up-gradation of existing road to 2L PS fr is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618888. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up-gradation of existing road to 2L PS fr is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.