Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.0.00 to Km.18.00Package-1
Original Cost
₹930 Cr
Baseline estimate
Revised Cost
₹869 Cr
Latest approved cost
Expenditure
₹403 Cr
Spent to date
Utilization
46.4%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹466 Cr
Budget left
Budget Utilization
46.4%Spent
₹403 Cr
Remaining
₹466 Cr
Total
₹869 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/12/2025
Revised Completion
31/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹930 Cr — no cost escalation recorded.
Expenditure stands at ₹403 Cr, which is 46.4% of the revised project cost.
Remaining budget: ₹466 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.0.00 to Km.18.00Package-1 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹930.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Secti"?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.0.00 to Km.18.00Package-1 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹930 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹930 Cr and has been revised to ₹869 Cr — a cost overrun of -6.5%. Expenditure to date: ₹403 Cr (46.4% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618822. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up gradation from 4 to 8 laning of Chandi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.