Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.39.000 to Km.60.00 Package-3
Original Cost
₹862 Cr
Baseline estimate
Revised Cost
₹939 Cr
Latest approved cost
Expenditure
₹396 Cr
Spent to date
Utilization
42.2%
Of revised budget
Cost Status
+8.9%
+₹77 Cr increase
Remaining
₹543 Cr
Budget left
Budget Utilization
42.2%Spent
₹396 Cr
Remaining
₹543 Cr
Total
₹939 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹862 Cr
Revised Cost
₹939 Cr
Increase
+₹77 Cr
Escalation
+8.9%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/12/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹77 Cr (8.9%) from the original estimate of ₹862 Cr.
Expenditure stands at ₹396 Cr, which is 42.2% of the revised project cost.
Remaining budget: ₹543 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.39.000 to Km.60.00 Package-3 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹862.00 Cr, later revised to ₹938.55 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Secti"?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km.39.000 to Km.60.00 Package-3 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹862 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹862 Cr and has been revised to ₹939 Cr — a cost overrun of +8.9%. Expenditure to date: ₹396 Cr (42.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618820. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up gradation from 4 to 8 laning of Chandi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.