Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km 18.00 to Km 39.00 in the State of Odisha on HAM mode Package-2
Original Cost
₹920 Cr
Baseline estimate
Revised Cost
₹950 Cr
Latest approved cost
Expenditure
₹435 Cr
Spent to date
Utilization
45.8%
Of revised budget
Cost Status
+3.3%
+₹30 Cr increase
Remaining
₹515 Cr
Budget left
Budget Utilization
45.8%Spent
₹435 Cr
Remaining
₹515 Cr
Total
₹950 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹920 Cr
Revised Cost
₹950 Cr
Increase
+₹30 Cr
Escalation
+3.3%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
14/12/2025
Revised Completion
30/11/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹30 Cr (3.3%) from the original estimate of ₹920 Cr.
Expenditure stands at ₹435 Cr, which is 45.8% of the revised project cost.
Remaining budget: ₹515 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km 18.00 to Km 39.00 in the State of Odisha on HAM mode Package-2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹920.00 Cr, later revised to ₹950.40 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Secti"?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandikhole Paradip Section of NH-53 Old NH 5A from Km 18.00 to Km 39.00 in the State of Odisha on HAM mode Package-2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹920 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹920 Cr and has been revised to ₹950 Cr — a cost overrun of +3.3%. Expenditure to date: ₹435 Cr (45.8% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and Up gradation from 4 to 8 laning of Chandi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618821. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and Up gradation from 4 to 8 laning of Chandi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.