Rehabilitation and up-gradation and completion of balance work of section from Km 155.00 to Km 181.00 End of Jarwa to Rangat of NH -4 Total length 26 Km to Intermediate Lane/2-lane with hard shoulders in the UT of A&N Islands on EPC basis - Package-III.B Balance work
Original Cost
₹184 Cr
Baseline estimate
Revised Cost
₹333 Cr
Latest approved cost
Expenditure
₹164 Cr
Spent to date
Utilization
49.1%
Of revised budget
Cost Status
+81.0%
+₹149 Cr increase
Remaining
₹169 Cr
Budget left
Budget Utilization
49.1%Spent
₹164 Cr
Remaining
₹169 Cr
Total
₹333 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹184 Cr
Revised Cost
₹333 Cr
Increase
+₹149 Cr
Escalation
+81.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
05/10/2025
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹149 Cr (81.0%) from the original estimate of ₹184 Cr.
Expenditure stands at ₹164 Cr, which is 49.1% of the revised project cost.
Remaining budget: ₹169 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Rehabilitation and up-gradation and completion of balance work of section from Km 155.00 to Km 181.00 End of Jarwa to Rangat of NH -4 Total length 26 Km to Intermediate Lane/2-lane with hard shoulders in the UT of A&N Islands on EPC basis - Package-III.B Balance work is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹184.00 Cr, later revised to ₹333.12 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Rehabilitation and up-gradation and completion of balance work of section from K"?
- Rehabilitation and up-gradation and completion of balance work of section from Km 155.00 to Km 181.00 End of Jarwa to Rangat of NH -4 Total length 26 Km to Intermediate Lane/2-lane with hard shoulders in the UT of A&N Islands on EPC basis - Package-III.B Balance work is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andaman & Nicobar. Original cost: ₹184 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹184 Cr and has been revised to ₹333 Cr — a cost overrun of +81%. Expenditure to date: ₹164 Cr (49.1% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Rehabilitation and up-gradation and completion of balance wo is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619185. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Rehabilitation and up-gradation and completion of balance wo is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.