Roads & HighwaysIPM · Central Project#619221

Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand.

Ministry of Road Transport & HighwaysUttarakhand
Revised Cost: ₹253 CrUtilization: 0.1%

Original Cost

₹253 Cr

Baseline estimate

On budget

Revised Cost

₹253 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.1%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹253 Cr

Budget left

Budget Utilization

0.1%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹253 Cr

Total

₹253 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

15/09/2027

Revised Completion

15/09/2027

Completed

Project Details

Project Code619221
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateUttarakhand
Data Month2026-08

Financial Summary

Original Cost₹253 Cr
Revised Cost₹253 Cr
Expenditure₹0 Cr
Original End Date15/09/2027
Revised Date15/09/2027

Project Intelligence

Project is within original budget of ₹253 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.1% of the revised project cost.

Remaining budget: ₹253 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹253.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chaina"?
Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹253 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹253 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.1% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-10 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619221. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-10 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.