Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand.
Original Cost
₹253 Cr
Baseline estimate
Revised Cost
₹253 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.1%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹253 Cr
Budget left
Budget Utilization
0.1%Spent
₹0 Cr
Remaining
₹253 Cr
Total
₹253 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
15/09/2027
Revised Completion
15/09/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹253 Cr — no cost escalation recorded.
Expenditure stands at ₹0 Cr, which is 0.1% of the revised project cost.
Remaining budget: ₹253 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand. is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹253.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chaina"?
- Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-109 From Design Chainage 000 Existing Chainage Km.54050 To Design Chainage 7875 Existing Chainage Km.61550 Due To Proposed Expansion Of Pantnagar Airport in the state of Uttarakhand. is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Uttarakhand. Original cost: ₹253 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹253 Cr has not been significantly revised. Expenditure: ₹0 Cr (0.1% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-10 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 619221. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Realignment of Rudrapur-Kathgodam Section of NH-87 New NH-10 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.