Original Cost
₹1656 Cr
Baseline estimate
Revised Cost
₹13.3K Cr
Latest approved cost
Expenditure
₹5084 Cr
Spent to date
Utilization
38.2%
Of revised budget
Cost Status
+704.0%
+₹11.7K Cr increase
Remaining
₹8230 Cr
Budget left
Budget Utilization
38.2%Spent
₹5084 Cr
Remaining
₹8230 Cr
Total
₹13.3K Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1656 Cr
Revised Cost
₹13.3K Cr
Increase
+₹11.7K Cr
Escalation
+704.0%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2027
Revised Completion
30/09/2028
Completed
Project Details
Financial Summary
Project Intelligence
Mega infrastructure project worth ₹13.3K Cr — among the largest central projects in Maharashtra.
Cost has increased by ₹11.7K Cr (704.0%) from the original estimate of ₹1656 Cr.
Expenditure stands at ₹5084 Cr, which is 38.2% of the revised project cost.
Remaining budget: ₹8230 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Ratlam-Mhow-Khandwa-Akola 472.64 km including material modification for Fatehabad-Chandrawati Ganj-Ujjain 22.96 km and Rau-DADN doubling 9.40 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1656.00 Cr, later revised to ₹13314.50 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Ratlam-Mhow-Khandwa-Akola 472.64 km including material modification for Fatehaba"?
- Ratlam-Mhow-Khandwa-Akola 472.64 km including material modification for Fatehabad-Chandrawati Ganj-Ujjain 22.96 km and Rau-DADN doubling 9.40 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Maharashtra. Original cost: ₹1656 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1656 Cr and has been revised to ₹13315 Cr — a cost overrun of +704%. Expenditure to date: ₹5084 Cr (38.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Ratlam-Mhow-Khandwa-Akola 472.64 km including material modif is under the Ministry of Railways in the Railways sector. Project code: 705457. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Ratlam-Mhow-Khandwa-Akola 472.64 km including material modif is one of several Bihar projects tracked under the Railways sector on the IPM system.