Oil & GasIPM · Central Project +0.1% overrun#619226

Provision of four bitumen tanks with capacity of 5 TMT each at Visakh Refinery

Ministry of Petroleum & Natural GasAndhra Pradesh
Revised Cost: ₹258 CrUtilization: 4.6%Overrun: +₹0 Cr

Original Cost

₹258 Cr

Baseline estimate

+0% overrun

Revised Cost

₹258 Cr

Latest approved cost

Expenditure

₹12 Cr

Spent to date

Utilization

4.6%

Of revised budget

Escalated

Cost Status

+0.1%

+₹0 Cr increase

Remaining

₹247 Cr

Budget left

Budget Utilization

4.6%
0%25%50%75%100%

Spent

₹12 Cr

Remaining

₹247 Cr

Total

₹258 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹258 Cr

Revised Cost

₹258 Cr

Increase

+₹0 Cr

Escalation

+0.1%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

24/03/2028

Revised Completion

24/03/2028

Completed

Project Details

Project Code619226
SectorOil & Gas
MinistryMinistry of Petroleum & Natural Gas
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹258 Cr
Revised Cost₹258 Cr
Expenditure₹12 Cr
Original End Date24/03/2028
Revised Date24/03/2028

Project Intelligence

Cost has increased by ₹0 Cr (0.1%) from the original estimate of ₹258 Cr.

Expenditure stands at ₹12 Cr, which is 4.6% of the revised project cost.

Remaining budget: ₹247 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.

Provision of four bitumen tanks with capacity of 5 TMT each at Visakh Refinery is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹258.00 Cr, later revised to ₹258.34 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Provision of four bitumen tanks with capacity of 5 TMT each at Visakh Refinery"?
Provision of four bitumen tanks with capacity of 5 TMT each at Visakh Refinery is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Andhra Pradesh. Original cost: ₹258 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹258 Cr and has been revised to ₹258 Cr — a cost overrun of +0.1%. Expenditure to date: ₹12 Cr (4.6% of revised cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Provision of four bitumen tanks with capacity of 5 TMT each is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 619226. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Provision of four bitumen tanks with capacity of 5 TMT each is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.