Power Recovery Turbine [PRT] in PFCCU unit as an Energy Conservation Scheme
Original Cost
₹294 Cr
Baseline estimate
Revised Cost
₹294 Cr
Latest approved cost
Expenditure
₹82 Cr
Spent to date
Utilization
27.9%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹212 Cr
Budget left
Budget Utilization
27.9%Spent
₹82 Cr
Remaining
₹212 Cr
Total
₹294 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2024
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹294 Cr — no cost escalation recorded.
Expenditure stands at ₹82 Cr, which is 27.9% of the revised project cost.
Remaining budget: ₹212 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Oil & Gas. Ministry: Ministry of Petroleum & Natural Gas.
Power Recovery Turbine [PRT] in PFCCU unit as an Energy Conservation Scheme is a centrally-funded infrastructure project under Ministry of Petroleum & Natural Gas, in the Oil & Gas sector. The original approved cost is ₹294.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Power Recovery Turbine [PRT] in PFCCU unit as an Energy Conservation Scheme"?
- Power Recovery Turbine [PRT] in PFCCU unit as an Energy Conservation Scheme is a centrally-funded infrastructure project under the Ministry of Petroleum & Natural Gas, tracked through the Investment Project Monitoring (IPM) system. Sector: Oil & Gas. State: Assam. Original cost: ₹294 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹294 Cr and has been revised to ₹294 Cr — a cost overrun of -0.2%. Expenditure to date: ₹82 Cr (27.9% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Power Recovery Turbine [PRT] in PFCCU unit as an Energy Cons is under the Ministry of Petroleum & Natural Gas in the Oil & Gas sector. Project code: 709865. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Power Recovery Turbine [PRT] in PFCCU unit as an Energy Cons is one of several Bihar projects tracked under the Oil & Gas sector on the IPM system.