Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328
Original Cost
₹819 Cr
Baseline estimate
Revised Cost
₹1297 Cr
Latest approved cost
Expenditure
₹189 Cr
Spent to date
Utilization
14.5%
Of revised budget
Cost Status
+58.4%
+₹478 Cr increase
Remaining
₹1109 Cr
Budget left
Budget Utilization
14.5%Spent
₹189 Cr
Remaining
₹1109 Cr
Total
₹1297 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹819 Cr
Revised Cost
₹1297 Cr
Increase
+₹478 Cr
Escalation
+58.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
03/09/2021
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹478 Cr (58.4%) from the original estimate of ₹819 Cr.
Expenditure stands at ₹189 Cr, which is 14.5% of the revised project cost.
Remaining budget: ₹1109 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹819.00 Cr, later revised to ₹1297.38 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328"?
- Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹819 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹819 Cr and has been revised to ₹1297 Cr — a cost overrun of +58.4%. Expenditure to date: ₹189 Cr (14.5% of revised cost). Data as of 2026-05.
- QWhich ministry is responsible for this project?
- Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618699. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Pipli Bhavnagar-Package 1 from km 136.025 to km 169.328 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.