NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23]
Original Cost
₹170 Cr
Baseline estimate
Revised Cost
₹184 Cr
Latest approved cost
Expenditure
₹0 Cr
Spent to date
Utilization
0.0%
Of revised budget
Cost Status
+8.2%
+₹14 Cr increase
Remaining
₹184 Cr
Budget left
Budget Utilization
0.0%Spent
₹0 Cr
Remaining
₹184 Cr
Total
₹184 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹170 Cr
Revised Cost
₹184 Cr
Increase
+₹14 Cr
Escalation
+8.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2026
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹14 Cr (8.2%) from the original estimate of ₹170 Cr.
Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.
Remaining budget: ₹184 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23] is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹170.00 Cr, later revised to ₹184.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23]"?
- NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23] is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Chhattisgarh. Original cost: ₹170 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹170 Cr and has been revised to ₹184 Cr — a cost overrun of +8.2%. Expenditure to date: ₹0 Cr (N/A% of revised cost). Data as of 2025-09.
- QWhich ministry is responsible for this project?
- NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23] is under the Ministry of Railways in the Railways sector. Project code: 709814. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. NIPANIA-BHATAPRA [14.4 KM] 4TH LINE [PB-72/NR/2022-23] is one of several Bihar projects tracked under the Railways sector on the IPM system.