New construction of Major Bridge with Approaches from Km 0.000 to 1.200 Madhopur -Badabanta section of NH-20 under NHO in Annual Plan 2022-23 in the State of Odisha
Original Cost
₹200 Cr
Baseline estimate
Revised Cost
₹200 Cr
Latest approved cost
Expenditure
₹5 Cr
Spent to date
Utilization
2.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹195 Cr
Budget left
Budget Utilization
2.5%Spent
₹5 Cr
Remaining
₹195 Cr
Total
₹200 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
09/10/2027
Revised Completion
09/10/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹200 Cr — no cost escalation recorded.
Expenditure stands at ₹5 Cr, which is 2.5% of the revised project cost.
Remaining budget: ₹195 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
New construction of Major Bridge with Approaches from Km 0.000 to 1.200 Madhopur -Badabanta section of NH-20 under NHO in Annual Plan 2022-23 in the State of Odisha is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹200.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "New construction of Major Bridge with Approaches from Km 0.000 to 1.200 Madhopur"?
- New construction of Major Bridge with Approaches from Km 0.000 to 1.200 Madhopur -Badabanta section of NH-20 under NHO in Annual Plan 2022-23 in the State of Odisha is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Odisha. Original cost: ₹200 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹200 Cr has not been significantly revised. Expenditure: ₹5 Cr (2.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- New construction of Major Bridge with Approaches from Km 0.0 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617898. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. New construction of Major Bridge with Approaches from Km 0.0 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.