Nathdwara Mavli - Devgarh Madariya 82.542 km
Original Cost
₹969 Cr
Baseline estimate
Revised Cost
₹1100 Cr
Latest approved cost
Expenditure
₹831 Cr
Spent to date
Utilization
75.5%
Of revised budget
Cost Status
+13.5%
+₹131 Cr increase
Remaining
₹269 Cr
Budget left
Budget Utilization
75.5%Spent
₹831 Cr
Remaining
₹269 Cr
Total
₹1100 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹969 Cr
Revised Cost
₹1100 Cr
Increase
+₹131 Cr
Escalation
+13.5%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
01/06/2028
Revised Completion
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹131 Cr (13.5%) from the original estimate of ₹969 Cr.
Expenditure stands at ₹831 Cr, which is 75.5% of the revised project cost.
Remaining budget: ₹269 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Nathdwara Mavli - Devgarh Madariya 82.542 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹969.00 Cr, later revised to ₹1100.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Nathdwara Mavli - Devgarh Madariya 82.542 km"?
- Nathdwara Mavli - Devgarh Madariya 82.542 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Rajasthan. Original cost: ₹969 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹969 Cr and has been revised to ₹1100 Cr — a cost overrun of +13.5%. Expenditure to date: ₹831 Cr (75.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Nathdwara Mavli - Devgarh Madariya 82.542 km is under the Ministry of Railways in the Railways sector. Project code: 611855. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Nathdwara Mavli - Devgarh Madariya 82.542 km is one of several Bihar projects tracked under the Railways sector on the IPM system.