Narayangarh - Bhadrak - 3rd line 155 km
Original Cost
₹2400 Cr
Baseline estimate
Revised Cost
₹3425 Cr
Latest approved cost
Expenditure
₹2927 Cr
Spent to date
Utilization
85.5%
Of revised budget
Cost Status
+42.7%
+₹1025 Cr increase
Remaining
₹498 Cr
Budget left
Budget Utilization
85.5%Spent
₹2927 Cr
Remaining
₹498 Cr
Total
₹3425 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹2400 Cr
Revised Cost
₹3425 Cr
Increase
+₹1025 Cr
Escalation
+42.7%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/12/2025
Revised Completion
31/01/2027
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1025 Cr (42.7%) from the original estimate of ₹2400 Cr.
Expenditure stands at ₹2927 Cr, which is 85.5% of the revised project cost.
Remaining budget: ₹498 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Narayangarh - Bhadrak - 3rd line 155 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2400.00 Cr, later revised to ₹3425.32 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Narayangarh - Bhadrak - 3rd line 155 km"?
- Narayangarh - Bhadrak - 3rd line 155 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: West Bengal. Original cost: ₹2400 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2400 Cr and has been revised to ₹3425 Cr — a cost overrun of +42.7%. Expenditure to date: ₹2927 Cr (85.5% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Narayangarh - Bhadrak - 3rd line 155 km is under the Ministry of Railways in the Railways sector. Project code: 705629. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Narayangarh - Bhadrak - 3rd line 155 km is one of several Bihar projects tracked under the Railways sector on the IPM system.