Murkongselek-Pasighat 26.15 km
Original Cost
₹435 Cr
Baseline estimate
Revised Cost
₹1334 Cr
Latest approved cost
Expenditure
₹1057 Cr
Spent to date
Utilization
79.2%
Of revised budget
Cost Status
+206.8%
+₹899 Cr increase
Remaining
₹277 Cr
Budget left
Budget Utilization
79.2%Spent
₹1057 Cr
Remaining
₹277 Cr
Total
₹1334 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹435 Cr
Revised Cost
₹1334 Cr
Increase
+₹899 Cr
Escalation
+206.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2025
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹899 Cr (206.8%) from the original estimate of ₹435 Cr.
Expenditure stands at ₹1057 Cr, which is 79.2% of the revised project cost.
Remaining budget: ₹277 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Murkongselek-Pasighat 26.15 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹435.00 Cr, later revised to ₹1334.45 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Murkongselek-Pasighat 26.15 km"?
- Murkongselek-Pasighat 26.15 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Assam. Original cost: ₹435 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹435 Cr and has been revised to ₹1334 Cr — a cost overrun of +206.8%. Expenditure to date: ₹1057 Cr (79.2% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Murkongselek-Pasighat 26.15 km is under the Ministry of Railways in the Railways sector. Project code: 705401. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Murkongselek-Pasighat 26.15 km is one of several Bihar projects tracked under the Railways sector on the IPM system.