Roads & HighwaysIPM · Central Project#617986

Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. Design Ch. Km 248010 to km 269900 to 2

Ministry of Road Transport & HighwaysAndhra Pradesh
Revised Cost: ₹293 CrUtilization: 0.0%

Original Cost

₹293 Cr

Baseline estimate

On budget

Revised Cost

₹293 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹293 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹293 Cr

Total

₹293 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

17/12/2026

Revised Completion

17/12/2026

Completed

Project Details

Project Code617986
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateAndhra Pradesh
Data Month2026-08

Financial Summary

Original Cost₹293 Cr
Revised Cost₹293 Cr
Expenditure₹0 Cr
Original End Date17/12/2026
Revised Date17/12/2026

Project Intelligence

Project is within original budget of ₹293 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹293 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. Design Ch. Km 248010 to km 269900 to 2 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹293.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. Design Ch. Km 248010"?
Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. Design Ch. Km 248010 to km 269900 to 2 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Andhra Pradesh. Original cost: ₹293 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹293 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 617986. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kurnool/Kadapa Border-Jammalamadugu section of NH-167K i.e. is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.