Kumbalam-Turavur - Patch doubling 15.59 km
Original Cost
₹813 Cr
Baseline estimate
Revised Cost
₹803 Cr
Latest approved cost
Expenditure
₹404 Cr
Spent to date
Utilization
50.3%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹399 Cr
Budget left
Budget Utilization
50.3%Spent
₹404 Cr
Remaining
₹399 Cr
Total
₹803 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2027
Revised Completion
31/03/2027
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹813 Cr — no cost escalation recorded.
Expenditure stands at ₹404 Cr, which is 50.3% of the revised project cost.
Remaining budget: ₹399 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Kumbalam-Turavur - Patch doubling 15.59 km is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹813.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Kumbalam-Turavur - Patch doubling 15.59 km"?
- Kumbalam-Turavur - Patch doubling 15.59 km is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Kerala. Original cost: ₹813 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹813 Cr and has been revised to ₹803 Cr — a cost overrun of -1.3%. Expenditure to date: ₹404 Cr (50.3% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Kumbalam-Turavur - Patch doubling 15.59 km is under the Ministry of Railways in the Railways sector. Project code: 705638. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kumbalam-Turavur - Patch doubling 15.59 km is one of several Bihar projects tracked under the Railways sector on the IPM system.