Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 of NH-8E & km. 120.900 to km. 121.150 of NH-8D
Original Cost
₹894 Cr
Baseline estimate
Revised Cost
₹1127 Cr
Latest approved cost
Expenditure
₹730 Cr
Spent to date
Utilization
64.8%
Of revised budget
Cost Status
+26.1%
+₹233 Cr increase
Remaining
₹397 Cr
Budget left
Budget Utilization
64.8%Spent
₹730 Cr
Remaining
₹397 Cr
Total
₹1127 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹894 Cr
Revised Cost
₹1127 Cr
Increase
+₹233 Cr
Escalation
+26.1%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
30/07/2020
Revised Completion
10/07/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹233 Cr (26.1%) from the original estimate of ₹894 Cr.
Expenditure stands at ₹730 Cr, which is 64.8% of the revised project cost.
Remaining budget: ₹397 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 of NH-8E & km. 120.900 to km. 121.150 of NH-8D is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹894.00 Cr, later revised to ₹1127.42 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 of NH-8E & km. 120.9"?
- Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 of NH-8E & km. 120.900 to km. 121.150 of NH-8D is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Gujarat. Original cost: ₹894 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹894 Cr and has been revised to ₹1127 Cr — a cost overrun of +26.1%. Expenditure to date: ₹730 Cr (64.8% of revised cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618833. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kodinar - Veraval Package VI from km. 221.610 to km. 263.00 is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.