Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield from Chintagudem village to Recherla village Design Chainage 63117 to 105236]
Original Cost
₹830 Cr
Baseline estimate
Revised Cost
₹1227 Cr
Latest approved cost
Expenditure
₹670 Cr
Spent to date
Utilization
54.6%
Of revised budget
Cost Status
+47.8%
+₹397 Cr increase
Remaining
₹557 Cr
Budget left
Budget Utilization
54.6%Spent
₹670 Cr
Remaining
₹557 Cr
Total
₹1227 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹830 Cr
Revised Cost
₹1227 Cr
Increase
+₹397 Cr
Escalation
+47.8%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
26/09/2024
Revised Completion
30/09/2026
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹397 Cr (47.8%) from the original estimate of ₹830 Cr.
Expenditure stands at ₹670 Cr, which is 54.6% of the revised project cost.
Remaining budget: ₹557 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield from Chintagudem village to Recherla village Design Chainage 63117 to 105236] is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹830.00 Cr, later revised to ₹1227.07 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield from Chintagudem vi"?
- Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield from Chintagudem village to Recherla village Design Chainage 63117 to 105236] is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Telangana. Original cost: ₹830 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹830 Cr and has been revised to ₹1227 Cr — a cost overrun of +47.8%. Expenditure to date: ₹670 Cr (54.6% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618747. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Khammam-Devarapalle Pkg III [4L Access Controlled Greenfield is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.