RailwaysIPM · Central Project +72.2% overrun#705612

Kazipet-Vijayawada 3rd line with electrification [220 km]

Ministry of RailwaysAndhra Pradesh
Revised Cost: ₹3363 CrUtilization: 154.4%Overrun: +₹1410 Cr

Original Cost

₹1953 Cr

Baseline estimate

+72% overrun

Revised Cost

₹3363 Cr

Latest approved cost

Expenditure

₹5193 Cr

Spent to date

Utilization

154.4%

Of revised budget

Escalated

Cost Status

+72.2%

+₹1410 Cr increase

Remaining

₹0 Cr

Budget left

Budget Utilization

154.4%
0%25%50%75%100%

Spent

₹5193 Cr

Remaining

₹0 Cr

Total

₹3363 Cr

Budget Split

SpentRemaining

Cost Escalation Analysis

Original Cost

₹1953 Cr

Revised Cost

₹3363 Cr

Increase

+₹1410 Cr

Escalation

+72.2%

Project Timeline

Project Approved

Construction / Implementation

Original End Date

28/02/2025

Revised Completion

31/12/2025

Completed

Project Details

Project Code705612
SectorRailways
MinistryMinistry of Railways
StateAndhra Pradesh
Data Month2026-06

Financial Summary

Original Cost₹1953 Cr
Revised Cost₹3363 Cr
Expenditure₹5193 Cr
Original End Date28/02/2025
Revised Date31/12/2025

Project Intelligence

Cost has increased by ₹1410 Cr (72.2%) from the original estimate of ₹1953 Cr.

Expenditure stands at ₹5193 Cr, which is 154.4% of the revised project cost.

Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Railways. Ministry: Ministry of Railways.

Kazipet-Vijayawada 3rd line with electrification [220 km] is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1953.00 Cr, later revised to ₹3363.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Kazipet-Vijayawada 3rd line with electrification [220 km]"?
Kazipet-Vijayawada 3rd line with electrification [220 km] is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Andhra Pradesh. Original cost: ₹1953 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost was ₹1953 Cr and has been revised to ₹3363 Cr — a cost overrun of +72.2%. Expenditure to date: ₹5193 Cr (154.4% of revised cost). Data as of 2026-06.
QWhich ministry is responsible for this project?
Kazipet-Vijayawada 3rd line with electrification [220 km] is under the Ministry of Railways in the Railways sector. Project code: 705612. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kazipet-Vijayawada 3rd line with electrification [220 km] is one of several Bihar projects tracked under the Railways sector on the IPM system.