Kazipet-Vijayawada 3rd line with electrification [220 km]
Original Cost
₹1953 Cr
Baseline estimate
Revised Cost
₹3363 Cr
Latest approved cost
Expenditure
₹5193 Cr
Spent to date
Utilization
154.4%
Of revised budget
Cost Status
+72.2%
+₹1410 Cr increase
Remaining
₹0 Cr
Budget left
Budget Utilization
154.4%Spent
₹5193 Cr
Remaining
₹0 Cr
Total
₹3363 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1953 Cr
Revised Cost
₹3363 Cr
Increase
+₹1410 Cr
Escalation
+72.2%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/02/2025
Revised Completion
31/12/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1410 Cr (72.2%) from the original estimate of ₹1953 Cr.
Expenditure stands at ₹5193 Cr, which is 154.4% of the revised project cost.
Remaining budget: ₹0 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Kazipet-Vijayawada 3rd line with electrification [220 km] is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1953.00 Cr, later revised to ₹3363.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Kazipet-Vijayawada 3rd line with electrification [220 km]"?
- Kazipet-Vijayawada 3rd line with electrification [220 km] is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Andhra Pradesh. Original cost: ₹1953 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1953 Cr and has been revised to ₹3363 Cr — a cost overrun of +72.2%. Expenditure to date: ₹5193 Cr (154.4% of revised cost). Data as of 2026-06.
- QWhich ministry is responsible for this project?
- Kazipet-Vijayawada 3rd line with electrification [220 km] is under the Ministry of Railways in the Railways sector. Project code: 705612. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kazipet-Vijayawada 3rd line with electrification [220 km] is one of several Bihar projects tracked under the Railways sector on the IPM system.