Katni - Bina Third Railway Line [279 km]
Original Cost
₹2478 Cr
Baseline estimate
Revised Cost
₹4127 Cr
Latest approved cost
Expenditure
₹3368 Cr
Spent to date
Utilization
81.6%
Of revised budget
Cost Status
+66.6%
+₹1649 Cr increase
Remaining
₹759 Cr
Budget left
Budget Utilization
81.6%Spent
₹3368 Cr
Remaining
₹759 Cr
Total
₹4127 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹2478 Cr
Revised Cost
₹4127 Cr
Increase
+₹1649 Cr
Escalation
+66.6%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
31/03/2022
Revised Completion
31/12/2025
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1649 Cr (66.6%) from the original estimate of ₹2478 Cr.
Expenditure stands at ₹3368 Cr, which is 81.6% of the revised project cost.
Remaining budget: ₹759 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Katni - Bina Third Railway Line [279 km] is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹2478.00 Cr, later revised to ₹4127.23 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Katni - Bina Third Railway Line [279 km]"?
- Katni - Bina Third Railway Line [279 km] is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: Madhya Pradesh. Original cost: ₹2478 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹2478 Cr and has been revised to ₹4127 Cr — a cost overrun of +66.6%. Expenditure to date: ₹3368 Cr (81.6% of revised cost). Data as of 2026-02.
- QWhich ministry is responsible for this project?
- Katni - Bina Third Railway Line [279 km] is under the Ministry of Railways in the Railways sector. Project code: 705651. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Katni - Bina Third Railway Line [279 km] is one of several Bihar projects tracked under the Railways sector on the IPM system.