Original Cost
₹1000 Cr
Baseline estimate
Revised Cost
₹2154 Cr
Latest approved cost
Expenditure
₹927 Cr
Spent to date
Utilization
43.0%
Of revised budget
Cost Status
+115.4%
+₹1154 Cr increase
Remaining
₹1227 Cr
Budget left
Budget Utilization
43.0%Spent
₹927 Cr
Remaining
₹1227 Cr
Total
₹2154 Cr
Budget Split
Cost Escalation Analysis
Original Cost
₹1000 Cr
Revised Cost
₹2154 Cr
Increase
+₹1154 Cr
Escalation
+115.4%
Project Timeline
Project Approved
Construction / Implementation
Original End Date
28/02/2027
Revised Completion
31/03/2028
Completed
Project Details
Financial Summary
Project Intelligence
Cost has increased by ₹1154 Cr (115.4%) from the original estimate of ₹1000 Cr.
Expenditure stands at ₹927 Cr, which is 43.0% of the revised project cost.
Remaining budget: ₹1227 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Railways. Ministry: Ministry of Railways.
Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Nabadwipghat - GC, Krishnanagar-Chartala, MM for Krishnanagar-Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop 9.58 km, Ranaghat-Lalgola-strengthening bridge No.2 is a centrally-funded infrastructure project under Ministry of Railways, in the Railways sector. The original approved cost is ₹1000.00 Cr, later revised to ₹2153.91 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Nabadwipghat - GC, Krish"?
- Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Nabadwipghat - GC, Krishnanagar-Chartala, MM for Krishnanagar-Chapra-NL, Naihati-Ranaghat-3rd line, Nabadwipghat-Nabadwipdham upto BB loop 9.58 km, Ranaghat-Lalgola-strengthening bridge No.2 is a centrally-funded infrastructure project under the Ministry of Railways, tracked through the Investment Project Monitoring (IPM) system. Sector: Railways. State: West Bengal. Original cost: ₹1000 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost was ₹1000 Cr and has been revised to ₹2154 Cr — a cost overrun of +115.4%. Expenditure to date: ₹927 Cr (43.0% of revised cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Naba is under the Ministry of Railways in the Railways sector. Project code: 400247. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Kalinarayanpur-Krishnanagar with Krishnanagar-Shantipur-Naba is one of several Bihar projects tracked under the Railways sector on the IPM system.