Improvement/Widening to 2-Lane with Paved Shoulder from design Km 45.760 to Km 63.530 between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance work Pkg-4
Original Cost
₹446 Cr
Baseline estimate
Revised Cost
₹446 Cr
Latest approved cost
Expenditure
₹42 Cr
Spent to date
Utilization
9.5%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹404 Cr
Budget left
Budget Utilization
9.5%Spent
₹42 Cr
Remaining
₹404 Cr
Total
₹446 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
19/04/2026
Revised Completion
31/10/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹446 Cr — no cost escalation recorded.
Expenditure stands at ₹42 Cr, which is 9.5% of the revised project cost.
Remaining budget: ₹404 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement/Widening to 2-Lane with Paved Shoulder from design Km 45.760 to Km 63.530 between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance work Pkg-4 is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹446.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement/Widening to 2-Lane with Paved Shoulder from design Km 45.760 to Km 6"?
- Improvement/Widening to 2-Lane with Paved Shoulder from design Km 45.760 to Km 63.530 between Shillong-Dawki under JICA ODA Loan assistance Phase-II -Balance work Pkg-4 is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Meghalaya. Original cost: ₹446 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹446 Cr has not been significantly revised. Expenditure: ₹42 Cr (9.5% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement/Widening to 2-Lane with Paved Shoulder from desi is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618375. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Widening to 2-Lane with Paved Shoulder from desi is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.