Roads & HighwaysIPM · Central Project#618295

Improvement/Widening of New NH-217 Dainadubi-Darugiri section to Two lane with paved shoulder in Meghalaya from design Km 0000 to Km 40840 existing Km 8600 to Km 53000 of Old NH-62 under BMP Lot-1 Pkg-1B Meghalaya portion

Ministry of Road Transport & HighwaysMeghalaya
Revised Cost: ₹706 CrUtilization: 0.0%

Original Cost

₹706 Cr

Baseline estimate

On budget

Revised Cost

₹706 Cr

Latest approved cost

Expenditure

₹0 Cr

Spent to date

Utilization

0.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹706 Cr

Budget left

Budget Utilization

0.0%
0%25%50%75%100%

Spent

₹0 Cr

Remaining

₹706 Cr

Total

₹706 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

20/03/2027

Revised Completion

19/03/2027

Completed

Project Details

Project Code618295
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateMeghalaya
Data Month2026-08

Financial Summary

Original Cost₹706 Cr
Revised Cost₹706 Cr
Expenditure₹0 Cr
Original End Date20/03/2027
Revised Date19/03/2027

Project Intelligence

Project is within original budget of ₹706 Cr — no cost escalation recorded.

Expenditure stands at ₹0 Cr, which is 0.0% of the revised project cost.

Remaining budget: ₹706 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement/Widening of New NH-217 Dainadubi-Darugiri section to Two lane with paved shoulder in Meghalaya from design Km 0000 to Km 40840 existing Km 8600 to Km 53000 of Old NH-62 under BMP Lot-1 Pkg-1B Meghalaya portion is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹706.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement/Widening of New NH-217 Dainadubi-Darugiri section to Two lane with p"?
Improvement/Widening of New NH-217 Dainadubi-Darugiri section to Two lane with paved shoulder in Meghalaya from design Km 0000 to Km 40840 existing Km 8600 to Km 53000 of Old NH-62 under BMP Lot-1 Pkg-1B Meghalaya portion is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Meghalaya. Original cost: ₹706 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹706 Cr has not been significantly revised. Expenditure: ₹0 Cr (N/A% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement/Widening of New NH-217 Dainadubi-Darugiri sectio is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618295. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Widening of New NH-217 Dainadubi-Darugiri sectio is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.