Roads & HighwaysIPM · Central Project#618300

Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A

Ministry of Road Transport & HighwaysManipur
Revised Cost: ₹379 CrUtilization: 83.0%

Original Cost

₹379 Cr

Baseline estimate

On budget

Revised Cost

₹379 Cr

Latest approved cost

Expenditure

₹315 Cr

Spent to date

Utilization

83.0%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹64 Cr

Budget left

Budget Utilization

83.0%
0%25%50%75%100%

Spent

₹315 Cr

Remaining

₹64 Cr

Total

₹379 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

18/04/2022

Revised Completion

31/12/2026

Completed

Project Details

Project Code618300
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹379 Cr
Revised Cost₹379 Cr
Expenditure₹315 Cr
Original End Date18/04/2022
Revised Date31/12/2026

Project Intelligence

Project is within original budget of ₹379 Cr — no cost escalation recorded.

Expenditure stands at ₹315 Cr, which is 83.0% of the revised project cost.

Remaining budget: ₹64 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹379.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from "?
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹379 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹379 Cr has not been significantly revised. Expenditure: ₹315 Cr (83.0% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618300. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.