Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A
Original Cost
₹379 Cr
Baseline estimate
Revised Cost
₹379 Cr
Latest approved cost
Expenditure
₹315 Cr
Spent to date
Utilization
83.0%
Of revised budget
Cost Status
On Budget
No escalation
Remaining
₹64 Cr
Budget left
Budget Utilization
83.0%Spent
₹315 Cr
Remaining
₹64 Cr
Total
₹379 Cr
Budget Split
Project Timeline
Project Approved
Construction / Implementation
Original End Date
18/04/2022
Revised Completion
31/12/2026
Completed
Project Details
Financial Summary
Project Intelligence
Project is within original budget of ₹379 Cr — no cost escalation recorded.
Expenditure stands at ₹315 Cr, which is 83.0% of the revised project cost.
Remaining budget: ₹64 Cr. Tracked under the DPIIT Investment Project Monitoring system.
Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹379.00 Cr.
This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.
Frequently Asked Questions
- QWhat is IPM project "Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from "?
- Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili section of Imphal-Kohima road NH-02 Design Chainage from Km 262175 to Km 274610 in the state of Manipur on EPC mode Pkg-4A is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹379 Cr.
- QWhat is the cost overrun for this Bihar IPM project?
- The original cost of ₹379 Cr has not been significantly revised. Expenditure: ₹315 Cr (83.0% of cost). Data as of 2026-08.
- QWhich ministry is responsible for this project?
- Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618300. Bihar is one of the states tracked under the central IPM dashboard for this project.
- QWhat is the IPM dashboard and what does it track?
- The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.