Roads & HighwaysIPM · Central Project#618299

Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section of Imphal-Kohima road NH-02 Design Chainage from Km 274610 to Km 287000 in the state of Manipur on EPC mode Pkg-4B

Ministry of Road Transport & HighwaysManipur
Revised Cost: ₹269 CrUtilization: 78.2%

Original Cost

₹269 Cr

Baseline estimate

On budget

Revised Cost

₹269 Cr

Latest approved cost

Expenditure

₹210 Cr

Spent to date

Utilization

78.2%

Of revised budget

Stable

Cost Status

On Budget

No escalation

Remaining

₹59 Cr

Budget left

Budget Utilization

78.2%
0%25%50%75%100%

Spent

₹210 Cr

Remaining

₹59 Cr

Total

₹269 Cr

Budget Split

SpentRemaining

Project Timeline

Project Approved

Construction / Implementation

Original End Date

05/06/2026

Revised Completion

24/01/2027

Completed

Project Details

Project Code618299
SectorRoads & Highways
MinistryMinistry of Road Transport & Highways
StateManipur
Data Month2026-08

Financial Summary

Original Cost₹269 Cr
Revised Cost₹269 Cr
Expenditure₹210 Cr
Original End Date05/06/2026
Revised Date24/01/2027

Project Intelligence

Project is within original budget of ₹269 Cr — no cost escalation recorded.

Expenditure stands at ₹210 Cr, which is 78.2% of the revised project cost.

Remaining budget: ₹59 Cr. Tracked under the DPIIT Investment Project Monitoring system.

Sector: Roads & Highways. Ministry: Ministry of Road Transport & Highways.

Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section of Imphal-Kohima road NH-02 Design Chainage from Km 274610 to Km 287000 in the state of Manipur on EPC mode Pkg-4B is a centrally-funded infrastructure project under Ministry of Road Transport & Highways, in the Roads & Highways sector. The original approved cost is ₹269.00 Cr.

This project is tracked under the Investment Project Monitoring (IPM) system maintained by DPIIT. Other central projects in the same sector are listed below.

?

Frequently Asked Questions

QWhat is IPM project "Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from "?
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section of Imphal-Kohima road NH-02 Design Chainage from Km 274610 to Km 287000 in the state of Manipur on EPC mode Pkg-4B is a centrally-funded infrastructure project under the Ministry of Road Transport & Highways, tracked through the Investment Project Monitoring (IPM) system. Sector: Roads & Highways. State: Manipur. Original cost: ₹269 Cr.
QWhat is the cost overrun for this Bihar IPM project?
The original cost of ₹269 Cr has not been significantly revised. Expenditure: ₹210 Cr (78.2% of cost). Data as of 2026-08.
QWhich ministry is responsible for this project?
Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is under the Ministry of Road Transport & Highways in the Roads & Highways sector. Project code: 618299. Bihar is one of the states tracked under the central IPM dashboard for this project.
QWhat is the IPM dashboard and what does it track?
The Investment Project Monitoring (IPM) dashboard, maintained by DPIIT (Department for Promotion of Industry and Internal Trade), tracks centrally-funded infrastructure projects worth ₹150 Crore and above. Improvement/Up-gradation of existing 2-Lane Road to 4-Lane D is one of several Bihar projects tracked under the Roads & Highways sector on the IPM system.